BradReese.Com Instant Quotes

Home About Repair Power Supplies Refurbished Blog Quick Links Site Map Contact Us

 
Brad Reese how to
Archive
  Help

Aironet

Power Supplies

VoIP Gateways

Cisco Repair

Refurbished Cisco

Cisco CPQRGs

New Cisco

New HP ProCurve

Cisco Tools

Competitive Lab Tests

Tech Forums

How-to Tutorials

CCIE Gossip

Blogroll

 
Archive of Brad's how to

Subscribe to Brad's how to

Cisco 6500 power supply and fan tray issues
Tue, 11/30/10 - 6:51am    View how to tips and comments

The "%C6KENV-SP-4-FANPSINCOMPAT: Fan tray and power supply 1 are incompatible" error message appears in Cisco 6500 that runs IOS.

These messages can appear in the logs:

%C6KENV-SP-STDBY-4-FANPSINCOMPAT: Fan tray and power supply 1 are incompatible
%C6KENV-SP-STDBY-4-FANPSINCOMPAT: Fan tray and power supply 2 are incompatible
%C6KENV-SP-2-SHUTDOWN_SCHEDULED: shutdown for power-supply 1 scheduled in 300 seconds

This message indicates that an upgrade of the power supply is required in order to sufficiently operate this fan tray. Although this is a minor alarm, the overcurrent protection on the power supply can start without further warning. This additional check is introduced to avoid random shutdown of the system in the case of WS-C6K-6SLOT-FAN2 that runs at high speed, which requires more power than it can handle and causes random shut down.

In some scenarios, these messages are seen after the conversion from hybrid to native IOS, where the switch uses a high speed fan tray (version 2) and the WS-CAC-1300W power supplies cannot handle the high speed of the fans. This is because this type of fan tray changes the speed, which depends on the temperature.

The high-speed fan tray is used with a Supervisor Engine 720. It also works with the Supervisor Engine 2, but the switch needs to have 2500 W or a higher capacity power supply in the chassis in order to power the high-speed fan tray.

The reason why this problem did not occur on CATOS is because on the Native version fan tray type is now being detected in that version of code.

You can check type of fan tray you have on the switch with this command:

switch#show environment status

fan-tray 1:
   fan-tray 1 type: WS-C6K-9SLOT-FAN2
   fan-tray 1 version: 2
   fan-tray 1 fan-fail: OK

Note: The part number for the fan tray version 1 is the same but without the 2, like this WS-C6K-6SLOT-FAN.

The problem is that FAN2 has no IDPROM. Thus, FAN2 config is burned into the IDPROM of the chassis. This chassis must be bought as a FAN2 config.

There are two possible resolution for such type of issues. Either downgrade to a fan tray version 1 or change the power supplies 2500W or stronger.

If you want to use FAN1, the IDPROM of chassis needs to be modified. Hence, the workaround when you use fan tray version 1 is to issue the hw-module fan-tray version 1 command in order for the fan tray version 1 to work correctly.

You may also wish to investigate Cisco Power Supplies.

Visit Brad's how to archive.


Don't be shy, what tips can you provide on Cisco 6500 power supply and fan tray issues?

Contact Brad Reese

Subscribe to Brad's how to

Brad's how to picks

  1. How to replace a Cisco 6500 switch power supply
  2. Cisco Catalyst 4500 does not recognize 1300 W power supply when used with 1400 W supply
  3. How to configure power supply redundancy in Cisco Catalyst 4500 switches
  4. What are the power supply specifications for a Cisco Catalyst 6500?
  5. How to remotely shutdown the power supply installed in a Cisco Catalyst 6500 with a Supervisor Engine 720 that runs Cisco IOS software
  6. How to configure IP addressing
  7. Reporting on Microsoft Exchange with Cisco NetFlow technology
  8. 4 steps to configure Cisco Flexible NetFlow
  9. How-to configure a free NetFlow forwarder or NetFlow duplicator
  10. How-to setup sampled Cisco NetFlow
  11. How to configure a Cisco Nexus 7000 to export NetFlow v9
  12. How to setup Cisco's Flexible NetFlow (FNF) with LEGO Blocks
  13. How to absolutely guarantee QoS with network traffic
  14. How-to configure Cisco Flexible NetFlow for NBAR exports
  15. How to reduce the high cost of T1 service
  16. How to setup Cisco IP SLA jitter monitors
  17. How to use NAT in overlapping networks
  18. How to redistribute routing protocols
  19. How to ensure that the optimal path is taken in a redundant network setup
  20. Archive of Brad's how to
 
blog comments powered by Disqus

Brad Reese music work ambience

Supplement Cisco SMARTnet Contracts

 

©2011 BradReese.Com - Home - About - Repair - Power Supplies - Refurbished - Blog - Quick Links - Site Map - Contact Us